Concrete calculator: cubic yards and bags
Enter your dimensions to get the cubic yards to order, with an allowance for waste, and the bag count if it’s a small pour. Works for slabs, footings, and round piers or columns.
Concrete calculator
Bag counts include waste and assume about 0.60 cu ft per 80-lb bag and 0.45 cu ft per 60-lb bag. Check the yield on the bag you buy.
How the calculator works
For slabs and footings: Length (ft) × Width (ft) × Thickness (in) ÷ 12 = cubic feet. For round piers: 3.1416 × (Diameter ÷ 2)² × Depth. Cubic feet ÷ 27 = cubic yards. The waste allowance is added on top.
How much waste should I add?
5% to 10% is a common allowance for slabs on well-compacted subgrade. Go higher for uneven or over-dug subgrade, hand-dug footings, or when you’re pumping. Measure thickness in several places. A slab that averages half an inch thicker than planned needs noticeably more concrete. Our guide on calculating concrete yards has worked examples and a quick chart.
Common questions
How many square feet does a yard of concrete cover?
About 81 square feet at 4 inches thick, 65 at 5 inches, 54 at 6 inches, and 40.5 at 8 inches, before waste.
How many bags make a yard?
About 45 80-lb bags or 60 60-lb bags per cubic yard, based on typical yields of 0.60 and 0.45 cubic feet per bag.
Should I round up my order?
Yes. Running short mid-pour costs far more than a little extra. Ask your supplier what increments they sell in, and about minimum loads and short-load fees.
Keep reading
How to calculate cubic yards of concrete
Formulas for slabs, footings, and piers, a quick chart, and how much extra to order.
TradeJob costing for concrete contractors
Ready-mix by the yard, pump days, rebar, and crew hours against every pour.
GuideJob costing for contractors: a step-by-step guide
What counts as a job cost, and a six-step system to know what every job made before it’s over.