Job costing for every trade
JobMargin comes set up for 47 trades, each with its own cost categories and the units that trade bids in. Here’s how it works for some of the most common ones.
Job costing for concrete contractors
Ready-mix by the yard, pump days, rebar, and crew hours against every pour.
TradeJob costing for concrete polishing contractors
Diamond tooling, densifier and guard, travel crews, hotels, and per diem on every floor.
TradeJob costing for flooring contractors
Materials, freight, and install labor by the square foot or square yard.
TradeJob costing for roofing contractors
Materials by the square, tear-off and disposal, decking surprises, and crew hours.
TradeJob costing for HVAC contractors
Equipment, ductwork, refrigerant, crane days, and install labor by the ton.
TradeJob costing for electrical contractors
Materials, fixtures, and labor by phase, so rough-in doesn’t eat the trim budget.
TradeJob costing for plumbing contractors
Underground, top-out, and trim: materials, fixtures, and labor on every job.
TradeJob costing for painting contractors
Paint by the gallon, supplies, and crew labor per unit or area.
Don’t see yours? Concrete cutting, masonry, tile, drywall, framing, stucco, insulation, siding, glazing, solar, fire protection, low voltage, excavation, paving, demolition, landscaping, pools, fencing, steel, restoration, cleaning, general contracting, home building, and more are all built in. See every trade on the home page.