Job costing for concrete contractors

Concrete margins are made or lost on a few things: how many yards the pour really took, how long the crew was on the slab, and whether that extra pump day got billed. JobMargin tracks each of them against the job while it’s running, not at closeout.

What concrete contractors track in JobMargin

Set up for concrete from the first day

When you pick Concrete & Flatwork as your trade, JobMargin loads these cost categories for budgets, receipts, and job costs. You can rename or add your own at any time.

Bid line items use the units concrete actually bid in: cubic yards (CY), square feet (SF), linear feet (LF), each (EA), and lump sum (LS).

Example: what a concrete job looks like mid-way

Three building pads, curb and gutter, and dumpster pads. About 55% of the scope has been poured.

Business park site concrete: contract $168,000
Cost categoryBudgetSpent so far
Ready-Mix Concrete$62,000$34,600
Labor$44,000$29,800
Rebar & Mesh$14,000$9,100
Pump & Placement$9,000$5,300
Forms & Lumber$7,000$4,900
Equipment Rental$6,000$3,200
Other$5,000$1,400
Total$147,000$88,300

Ready-mix is right on track at 56% of budget. Labor isn’t: 68% of the labor budget is gone with the job about 55% poured. Seeing that with nearly half the job left is the difference between fixing it and finding out at closeout.