A pool is built in stages, and the expensive surprises happen early: rock in the dig, extra steel, a longer plumbing run. JobMargin shows each stage against its budget, so you know where you stand before the finishes are ordered.

What pool builders track in JobMargin

Set up for pool from the first day

When you pick Pool & Spa as your trade, JobMargin loads these cost categories for budgets, receipts, and job costs. You can rename or add your own at any time.

Bid line items use the units pool actually bid in: square feet (SF), each (EA), and lump sum (LS).

Example: what a pool job looks like mid-way

A 16-by-36 gunite pool with an attached spa, tile line, and pebble finish. The dig, steel, plumbing, and shoot are done; the tile, coping, and finish are ahead.

Gunite pool and spa: contract $92,000
Cost categoryBudgetSpent so far
Excavation$9,000$11,400
Materials$22,000$14,800
Labor$18,000$10,600
Equipment & Pumps$9,500$0
Plaster & Tile$11,000$0
Permits$1,800$1,800
Other$2,700$600
Total$74,000$39,200

The dig came in at 127% of budget, about $2,400 over, after the crew hit rock. Everything else is on track, and the finish, tile, and equipment haven’t been bought yet. Rock is the kind of thing that belongs in a change order, ideally with a photo in the daily log from the day it happened.