Job costing for waterproofing contractors

Waterproofing margins usually die in surface prep: more patching, more grinding, or more cleaning than the bid assumed. JobMargin gives prep its own budget, so you see the overrun the day prep is done and can raise it with the owner while the evidence is fresh.

What waterproofing contractors track in JobMargin

Set up for waterproofing from the first day

When you pick Waterproofing as your trade, JobMargin loads these cost categories for budgets, receipts, and job costs. You can rename or add your own at any time.

Bid line items use the units waterproofing actually bid in: square feet (SF), linear feet (LF), gallons (GAL), each (EA), and lump sum (LS).

Example: what a waterproofing job looks like mid-way

Shot-blast prep, urethane traffic coating on 42,000 sq ft, and expansion joint sealants. Prep is done and the coating is about 40% down.

Parking deck traffic coating and joint sealants: contract $158,000
Cost categoryBudgetSpent so far
Membrane & Coatings$58,000$24,400
Labor$46,000$24,800
Surface Prep$14,000$15,900
Sealants$9,000$2,100
Equipment Rental$7,000$4,600
Fuel$2,000$900
Other$3,000$700
Total$139,000$73,400

Coating material is on pace at 42% with about 40% down. Surface prep is the problem: it’s finished, and it came in at 114% of budget, about $1,900 over, because the deck needed more patching than the bid assumed. That’s a change order conversation to have with the owner now, with the daily log photos to back it up.